PBSA-HVAC

Hot-water, ventilation and air-conditioning designed for high-density student blocks.

HiiLIFE specifies, installs and commissions hot-water, ventilation and air-conditioning across your student scheme, and maintains it afterwards.

Challenge

Keeping hot-water consistent throughout the term, apartments well ventilated and temperatures steady requires meticulous attention to detail.

Designing out overheating

We design all HVAC systems to minimise overheating risk, and ensure comfortable temperatures year-round.

Planning acoustic management

We assess plant noise against nearby receptors at design stage, so the system adhere's to sound limits.

One partner. One coordinated access plan.

One partner with one access plan turns a multi-faceted coordination problem into a single managed workflow delivering upgrades and important maintenance at the right pace for your turnaround window.

TECHNICAL PARTNERS

We engineer with market-leading equipment brands.

Solutions Overview

What we deliver within HVAC

Part L compliance

Air source heat pumps or a heat-network connection, specified for the scheme.

Part O compliance

Overheating demonstrated with TM59 dynamic thermal modelling against Part O.

Ventilation designed for the building

Ventilation designed to Part F, with mechanical heat recovery where an airtightness target needs it.

Commissioning backed by evidence

Systems commissioned to the CIBSE Commissioning Codes, with full O&M and asset records at handover.

Maintenance under a defined SLA

Planned and reactive maintenance across the estate under a defined response SLA.

The HiiLIFE Process

Here's how we deliver HVAC solutions to student accommodation blocks, big and small.

Specify

We specify the correct kit based on a free system design, factoring in CAPEX investment, and we design heating and cooling together. On an airtight new-build or a refurbishment project, we pay close attention to how residents will adjust their climate year-round.

Install & Integrate

We coordinate with your installer and integrate any system we design with the building controls, so there is no need to juggle suppliers.

Commission

Each system is commissioned to its specification and backed by evidence, because skipping that step tends to come back as a fault report a few months later. You receive the records, asset data and operating information needed to run the building and prove compliance, so you are not left with a pile of equipment and several phone numbers.

Support & Aftercare

We maintain all HVAC systems we install under a defined SLA, with spares managed directly through us, so when a fault turns up we fix it and you don’t have to chase anyone.

Case Studies

Proven across complex environments.

PBSAPBSASouthwark

Avonmouth Street, SouthwarkAvonmouth Street, Southwark

Carrier heat pumps and bespoke hot water cylinders deliver hot water for all apartments, with 360 kW LTHW and 2 × 3000 L buffer vessels.

Read Case Study 226 Bedrooms
Commercial · HotelCommercial · HotelSilverstone

Escapade, SilverstoneEscapade, Silverstone

Samsung VRF heat pumps and heat pumps support bedrooms, reception, gym and meeting rooms, with 150 kW cooling and 300 kW hot water.

Read Case Study 150 kW Cooling
PBSAPBSAGuildford

Guilden Village, GuildfordGuilden Village, Guildford

Samsung VRF air conditioning and hot-water heat pumps serve 533 bedrooms, with 900 kW space heating/cooling and 235 kW DHW.

Read Case Study 533 Bedrooms
Commercial · HotelCommercial · HotelGatwick

Ibis Styles, GatwickIbis Styles, Gatwick

Samsung VRF heat pumps provide domestic hot water for 182 rooms, with split-stage DHW generation up to 80°C.

Read Case Study 182 Rooms
House of WorshipHouse of WorshipEdgbaston

St Germain’s Church, EdgbastonSt Germain’s Church, Edgbaston

Samsung VRF heat pumps provide LTHW space heating, replacing an external diesel generator as part of the church’s decarbonisation plan.

Read Case Study 160 kW LTHW
PBSAPBSALeeds

Threadworks, LeedsThreadworks, Leeds

AV systems support reception, games room, gym, private dining and study spaces, with Samsung Hospitality TV and commercial signage.

Read Case Study 548 Bedrooms
PBSAPBSALeeds

The Store House, LeedsThe Store House, Leeds

AV systems cover reception, games room, co-working, gym, karaoke and cinema rooms, with Samsung Hospitality TV and commercial signage.

Read Case Study 369 Bedrooms
LeisureLeisureClapham

Arma BJJ, ClaphamArma BJJ, Clapham

Proposed AV, display, camera streaming, control and digital signage systems for dojos, amenities and co-working spaces.

Read Case Study Gym & Amenities
Build to RentBTRBirmingham

Moda Living, BirminghamModa, Birmingham

Samsung smart integrated appliances and SmartThings AI Energy support 720 homes across 39 floors.

Read Case Study 720 Homes
Build to RentBTRBirmingham

Sphere Group, One Eastside, BirminghamSphere, Birmingham

Energy-efficient smart-connected appliances support 581 apartments across 51 floors.

Read Case Study 581 Apartments
Build to RentBTREdinburgh

Goodstone Living, EdinburghGoodstone, Edinburgh

Energy-efficient Contract Range appliances support 338 apartments, with SmartThings AI Energy integrated fridge freezers.

Read Case Study 338 Apartments
Build to RentBTRCardiff

Watkin Jones, Central Quay, CardiffWatkin Jones, Central Quay, Cardiff

Energy-efficient Contract Range appliances support 718 apartments across two interlinked 23-storey towers.

Read Case Study 718 Apartments

See integrated building technology in action.

Come and see the quality of our work. Book a tour at our London show home.

  • Developer walkthrough
  • Contractor demonstration
  • Hospitality technology review
  • Product consultation
Book a tour
Testimonials

What our clients are saying.

“They help us design, they help us execute, they know what we are after. They help us design spaces efficiently in the way we wanted to really perform.”

Amir Mirmotahari Development Manager, Dandi

“The main benefit of HiiLIFE is a lot of companies are very specific in one area, so you’ll have an AV provider, a climate provider, a white goods provider. We like working with them because they deliver a one-stop shop service for construction and also really easy to project-manage with them.”

Paul Barnes Chief Operating Officer, Dandi

Ready to stop managing four suppliers and switch to one?

Fill out the form and we will be in touch within 20 minutes.